Madar (Dakar) - Senegal's Mines and Geology Minister, Cheikhou Oumar Seck, begins on Sunday, 22 November 2026, a working tour running until 27 November in the south-eastern regions of Kedougou and Tambacounda, ahead of a visit by President Bassirou Diomaye Faye to both regions from 26 to 29 November, according to the state daily "Le Soleil".
According to the paper, the tour aims to assess progress on mining projects and operating conditions. It includes meetings with sand operators in Tambacounda and artisanal miners in Bakel, and visits to Mako, Boto, Kharakhena and the Faleme river area.
In Kedougou, Petowal Mining Company is preparing to expand to the Bantaco and Tomboronkoto sites, a project expected to bring the state 751 billion CFA francs and create 700 jobs. The Boto project, developed by Morocco's Managem group, is a 464 million dollar investment that could generate 1,200 billion CFA francs for the state.
The region also hosts the Douta and Diamba Sud gold projects, with first production announced for 2028, as well as MIFERSO's iron project at Koudekourou, valued at 933 million dollars.
Artisanal gold mining, estimated at nearly four tonnes a year in the south-east according to older national statistics agency data, remains largely informal and unsafe: 55 collapses killed 92 people between 2025 and 2026, the same source said.
The state has launched a biometric registration programme that had enrolled 27,452 artisanal miners by 8 November, 22,081 in Kedougou and 5,371 in Tambacounda, aiming to formalise at least 50% of them by 2029. Mining permits are reserved for Senegalese nationals who meet the regulatory conditions.
A protocol signed on 3 November with the Armed Forces ministry also provides for army engineers to build seven pilot artisanal mining corridors at a cost of 488.4 million CFA francs, five in Kedougou and two in Tambacounda, while a national gold trading counter is being considered to improve traceability.
In Tambacounda, semi-mechanised mining has almost stalled since 2024, after a decree suspended mining operations until June 2027 in a 500-metre strip along the left bank of the Faleme river.




